The Barrington Beach House: The Finish Line

Season 33 · Episode 25 · First aired March 22, 2012

Light green grout is used with the glass tile backsplash. The garage gets an insulated steel door and storage system. A cable railing system is installed. A gas stove is installed in the living room. The new lighting design is shown.

Summary from TVmaze · CC BY-SA

Not on the schedule right now. See This Old House

How it played

No ratings yet · Rate it

Rate this episode

Sign in to rate